Offshore Petroleum Amendment (Greenhouse Gas Storage) Act 2008 (117 of 2008)

Schedule 1   Amendments relating to greenhouse gas storage etc.

Offshore Petroleum Act 2006

293   After subclause 4(5) of Schedule 3

Insert:

Vessels or structures that are facilities - offshore greenhouse gas storage operations

(5A) A vessel or structure is taken to be a facility for the purposes of this Schedule while that vessel or structure:

(a) is located at a site in Commonwealth waters; and

(b) is being used, or prepared for use, at that site:

(i) for the injection of a greenhouse gas substance into the seabed or subsoil; or

(ii) for the storage of a greenhouse gas substance in the seabed or subsoil; or

(iii) for the compression of a greenhouse gas substance; or

(iv) for the processing of a greenhouse gas substance; or

(v) for the pre-injection storage of a greenhouse gas substance; or

(vi) for the offloading of a greenhouse gas substance; or

(vii) for the monitoring of a greenhouse gas substance stored in the seabed or subsoil; or

(viii) for any combination of activities covered by any of the preceding subparagraphs; or

(ix) for the provision of accommodation for persons working on another facility, whether connected by a walkway to that other facility or not; or

(x) for drilling or servicing a well for injecting a greenhouse gas substance into the seabed or subsoil or doing work associated with the drilling or servicing process; or

(xi) for laying pipes for conveying a greenhouse gas substance, including any manufacturing of such pipes, or for doing work on an existing pipe; or

(xii) for the erection, dismantling or decommissioning of a vessel or structure referred to in a previous subparagraph of this paragraph; or

(xiii) for any other purpose related to offshore greenhouse gas storage operations that is prescribed for the purposes of this subparagraph.

(5B) Subclause (5A) applies to a vessel or structure:

(a) whether it is floating or fixed; and

(b) whether or not it is capable of independent navigation.

(5C) Subclause (5A) has effect subject to subclauses (6) and (7).

(5D) A vessel or structure used for a purpose referred to in subparagraph (5A)(b)(i), (ii), (iii), (iv), (v), (vi), (vii) or (viii) includes:

(a) any wells and associated plant and equipment by means of which a greenhouse gas substance processed or temporarily stored at the vessel or structure is injected into the seabed or subsoil; and

(b) any pipe or system of pipes through which a greenhouse gas substance is conveyed from the vessel or structure to a well; and

(c) any greenhouse gas injection line associated with the vessel or structure.

(5E) For the purposes of subclause (5A), a vessel or structure that is located offshore for the purpose of laying pipes as described in subparagraph (5A)(b)(xi) is taken to be located at a site, despite the fact that the vessel or structure moves as the pipe laying process proceeds.

Note: The heading to subclause 4(1) of Schedule 3 is altered by adding at the end " - offshore petroleum operations".


Copyright notice

© Australian Taxation Office for the Commonwealth of Australia

You are free to copy, adapt, modify, transmit and distribute material on this website as you wish (but not in any way that suggests the ATO or the Commonwealth endorses you or any of your services or products).