House of Representatives

Treasury Laws Amendment (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021

Explanatory Memorandum

(Circulated by authority of the Treasurer, the Hon. Josh Frydenberg MP)

Chapter 1 - Laminaria and Corallina cost recovery levy

Outline of chapter

1.1 The Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 introduces a temporary levy on offshore petroleum production to recover the Commonwealth's costs of decommissioning the Laminaria and Corallina oil fields and associated infrastructure.

1.2 The Treasury Laws Amendment (Laminaria And Corallina Decommissioning Cost Recovery Levy) Bill 2021 amends the Income Tax Assessment Act 1997, the Petroleum Resource Rent Tax Assessment Act 1987 and the Tax Administration Act 1953 to specify certain administrative features relating to the Laminaria and Corallina cost recovery levy, including the requirement that the levy is payable to the Commissioner of Taxation annually.

Context of amendments

1.3 The Bills provide for a temporary levy on offshore petroleum production which will recover the costs of the Australian Government decommissioning and remediating the Laminaria and Corallina oilfields and associated infrastructure.

1.4 The levy ensures that taxpayers are not left to pay for the decommissioning and remediation of production facilities and associated infrastructure in the Laminaria and Corallina oilfields.

1.5 The measure was announced as part of the 2021-22 Budget.

Summary of new law

1.6 The Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 creates a new, temporary levy on offshore petroleum production to recover the Commonwealth's costs of decommissioning the Laminaria and Corallina oil fields and associated infrastructure.

1.7 The levy will apply to registered holders of petroleum production licences under the Offshore Petroleum and Greenhouse Gas Storage Act 2006.

1.8 The levy will be at a standard rate of 48 cents per barrel of oil equivalent produced in each levy year.

1.9 To prevent over collection, the rate of levy for a year may be reduced where imposition of the levy at the standard rate would result in the collection of more levy than the Commonwealth's unrecovered costs as determined by the Resources Minister.

1.10 The Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 provides that the levy is imposed for financial years beginning between 1 July 2021 and 1 July 2029. This period has been chosen to ensure that the levy can be imposed for the duration of the decommissioning of the Laminaria and Corallina oil fields and associated infrastructure.

1.11 The Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 includes the power for the Resources Minister to terminate the levy once the Resources Minister is satisfied the Commonwealth's costs have been recovered.

1.12 The Treasury Laws Amendment (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 amends various taxation Acts to specify certain administrative features relating to the Laminaria and Corallina cost recovery levy. In particular, the amendments:

modify the Income Tax Assessment Act 1997 to specify that the levy is non-deductible; and
modify the Petroleum Resource Rent Tax Assessment Act 1987 to add payments of levy to the list of excluded expenditure. This ensures, amongst other things, that the levy is an excluded cost for the purposes of calculating upstream and downstream costs under the residual pricing metho d; and
modify the Tax Administration Act 1953 to:

-
limit the objection period and the period of review for the levy;
-
specify that the levy is payable to the Commissioner of Taxation; and
-
ensure that ordinary taxation collection and recovery provisions apply in relation to the levy.

Comparison of key features of new law and current law

New law Current law
A new, temporary levy is imposed on the production of offshore petroleum to allow the Commonwealth to recover the costs of the Commonwealth Government decommissioning and remediating the Laminaria and Corallina oilfields and associated infrastructure. No equivalent.

Detailed explanation of new law

1.13 The Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Bill 2021 will introduce the Offshore Petroleum (Laminaria and Corallina Decommissioning Cost Recovery Levy) Act 2021. [section 1 to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

Who is liable to pay the levy

1.14 The levy will apply to all registered holders of a petroleum production licence at any time during the levy year. [definition of 'leviable entity' in section 6 and section 10 to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.15 The levy will be payable on all petroleum recovered at the wellhead in a levy year. Petroleum for the purposes of the levy has the same meaning as defined in the Offshore Petroleum and Greenhouse Gas Storage Act 2006 [definition of 'petroleum' in section 6 to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.16 A levy year is each of the financial year beginning between 1 July 2021 and 1 July 2029. [subsection 7(1) to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

The rate of the levy

1.17 The amount of levy payable is calculated by applying the levy rate to the amount of petroleum recovered by the holder of petroleum production licences in relation to all licences held during a levy year.

1.18 The petroleum amount for the levy year is the total quantity of all petroleum measured at the wellhead, in barrels of oil equivalent. [definition of 'petroleum amount' in section 6 to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.19 The rate of the levy for a levy year is the lesser of:

48 cents per barrel of oil equivalent recovered in offshore licence areas in the licence period; and
the Commonwealth's unrecovered costs at the end of the levy year divided by the total barrels of oil equivalent produced under all licences in the levy year (the distributed levy rate). [section 11(1) and (2) to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.20 Barrel of oil equivalent is not defined in legislation but is a well understood term in the gas and petroleum industries. It is a unit of energy approximately equal to the energy of one barrel (158.9873 litres) of crude oil. The barrel of oil equivalent is a way of combining oil and natural gas productions into a single measurement.

1.21 Calculating barrel of oil equivalent is a common industry practice. The Society of Petroleum Engineers is an authoritative source referred to by industry. Their calculation formula is included in their Guidelines for Application of the Petroleum Resources Management System (November 2011) and is an example of a way that entities may choose to calculate barrel of oil equivalent.

1.22 Their commonly used calculation method for gas conversion for intercompany comparison purposes is:1 bbl of oil equivalent = 5.8 thousand standard cubic feet (Mscf) or 164.24 cubic metres (cu.m) of gas at STP (15°C and 1 atm).

1.23 The Commonwealth's unrecovered costs is the amount by which the total amount of levy assessed for previous levy years falls short of the total decommissioning cost. This amount is calculated within six months after the end of the levy year for which the determination is made. [section (8) to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.24 Total decommissioning costs means the total amount in dollars of net costs reasonably incurred by the Commonwealth in relation to the decommissioning-related activities. [definition of 'total decommissioning cost' in section (6) to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.25 This provides a mechanism to lower the levy rate for a levy year to avoid the Commonwealth collecting more levy than it costs to undertake decommissioning activities.

1.26 It is not anticipated that the Resources Minister will issue a determination in relation to the Commonwealth's unrecovered costs in respect of the first few levy years.

1.27 Instead, it is expected that such a determination would only be made during the tail end of the levy to provide that the amount of levy assessed over the life of the levy approximately equates to the decommissioning costs incurred by the Commonwealth.

1.28 The power for the Resources Minister to make this determination is limited in scope and does not allow the levy to be increased above the 48 cents per barrel of oil equivalent set by Parliament.

1.29 The volume of petroleum recovered is measured at the wellhead. Wellhead is not defined in the legislation but is a well understood term in the gas and petroleum industries. It is the point at which the petroleum product reaches the surface and enters storage facilities or pipes for transfer elsewhere. The wellhead typically incorporates equipment for controlling pressure in, and regulating the flow from, the well.

Termination of the levy

1.30 Once the Commonwealth's costs are recovered, the levy may be terminated early.

1.31 The levy will terminate on the 30 June following the Resources Minister making a determination, by legislative instrument, that the Commonwealth's unrecovered costs related to all activities associated with or connected to the decommissioning and remediation of the Laminaria and Corallina oil fields and associated infrastructure are nil and the Minister is satisfied no further recoverable costs are likely to be incurred by the Commonwealth. [subsections 7(2)-(4) to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.32 This limited power for the Resources Minister to terminate the levy early by way of a legislative instrument is both limited in its application and necessary and appropriate in these circumstances to ensure the design of the levy gives effect to the Government's intention that the levy is only in place until the Commonwealth has recovered its costs.

1.33 Due to the uncertain nature of the decommissioning and remediation activities, it is not possible to provide for an early termination mechanism on the face of the law because doing so would add significant complexity and risk the legislation not achieving its core purpose.

Returns, assessment and payment

1.34 A registered holder of a petroleum production licence must give annual returns within six months of the end of the levy year (31 December), in the approved form, to the Commissioner of Taxation. [item 11, subsection 125-5 to the Taxation Administration Act 1953]

1.35 This delay between the end of the levy year and when annual returns are provided to the Commissioner of Taxation will ensure that entities have sufficient time to accurately report their production for the levy year, including relying on the 'true up' that is customarily undertaken by licence holders at the end of the financial year.

1.36 In practice, the assessment will work as follows:

entities will report in the approved form their total barrel of oil equivalent recovered during the levy year to the Commissioner of Taxation by December 31 each year; and
if no determination has been made by the Resources Minister in relation to the Commonwealth's unrecovered costs, the standard rate of $0.48 per barrel of oil equivalent will apply by default; or
if the Resources Minister has made a determination in the levy year in relation to the Commonwealth's unrecovered costs as at the end of that levy year, the Commissioner of Taxation will use that information to determine whether a lower reduction rate applies for the levy year based on the total amount of petroleum that has been reported by all entities; and
the Commissioner of Taxation will issue notices of assessment to the entities.

1.37 The amount payable under the levy is due and payable 21 days after the time the Commissioner of Taxation provides an entity with a notice of assessment for the levy year.

1.38 The Commissioner of Taxation has general administration of these provisions. The effect of this is:

that people who acquire information under these provisions are subject to the confidentiality obligations and exceptions in Division 355 in Schedule 1 to the Taxation Administration Act 1953; and
Part IVC to the Taxation Administration Act 1953 applies to decisions made by the Commissioner of Taxation under these provisions; and
it provides for the use of the Commissioner of Taxation's enforcement and penalty powers for misleading or false information and fraudulent applications.

1.39 The period of review and the time limit for which a taxpayer must lodge an objection to an assessment of levy is limited to 60 days after the levy assessment is given to the entity. This will provide certainty to both Government and industry about the amount of levy required to be paid and will minimise the risk of over or under collection.

Consequential amendments

1.40 Consequential amendments ensure that:

a liability to pay this levy will be a tax-related liability;
general interest charge applies to outstanding payments of this levy;
the approved form is used, allowing the Commissioner of Taxation to properly administer the levy; and
define the term 'Laminaria and Corallina Decommissioning Levy'.

[Item 8, subsection 8AAB(4), table item 45B, to the Taxation Administration Act 1953 and Subsection 995-1(1) to the Income Tax Assessment Act 1997]

Application and transitional provisions

1.41 The Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021 commences on the day after Royal Assent. [section 2 to the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021]

1.42 The amendments to the Income Tax Assessment Act 1997, the Petroleum Resources Rent Tax Assessment Act 1987 and Taxation Administration Act 1953 commence at the same time as the Offshore Petroleum (Laminaria and Corallina Cost Recovery Levy) Act 2021 and apply in relation to financial years starting on or after 1 July 2021. [item 2(1) and 21 to the Treasury Laws Amendment (Laminaria and Corallina Decommissioning Cost Recovery Levy) Act 2021]


View full documentView full documentBack to top